DEWA

DEWA Approval Services in Dubai

Almost every electrical job in Dubai that touches the DEWA network needs an approval first: a new connection, a change of load, a meter relocation or a fit-out that adds circuits. DEWA accepts these applications only from registered consultants and contractors, and each one moves through several stages before power is released.

As a DEWA approved contractor in Dubai, UAE Approval Hub prepares the technical package, submits it, answers DEWA comments and coordinates the site inspection, so your project team deals with one point of contact instead of chasing each stage separately.

Landis+Gyr E570 CT-connected DEWA meter installed at a commercial site in Dubai

Who this is for

  • Building owners and developers needing a new electricity connection or building NOC
  • Tenants and fit-out contractors adding or changing electrical load
  • Facility managers relocating meters, panels or LV rooms
  • Consultants who want a contractor to handle submission and site inspection

What we handle

  • Reviewing your existing drawings, load and site conditions before anything is submitted
  • Preparing load schedules, maximum demand calculations and single line diagrams
  • Submitting through the DEWA portal, or through the Dubai Building Permit System where the project is licensed by Dubai Municipality
  • Responding to DEWA design comments and resubmitting where required
  • Arranging the LV inspection and clearing any snag list
  • Coordinating the meter installation date and supply release

Types of DEWA approvals we handle

How the process works

  1. Site and document reviewWe check what you already have, confirm which DEWA service applies and list anything missing.
  2. Technical packageLoad schedules, single line diagram, layouts and LV room details are prepared to DEWA's format.
  3. Submission and design approvalThe application is submitted and tracked. Design comments are answered until the LV design is approved.
  4. Connection invoiceDEWA issues the connection cost invoice, which the owner pays through DEWA's payment channels.
  5. Inspection and supply releaseOnce wiring is complete we book the LV inspection, clear any snags and confirm the meter installation date.

Documents checklist

Have these ready, or send what you have and we will tell you what is missing.

DEWA approval timelines

DEWA publishes service targets in working days for individual stages such as the building NOC, LV design approval and inspection. The overall timeline depends mainly on how complete the documents are, whether a substation is involved and when the site is ready for inspection. We give you a realistic estimate after reviewing your project rather than a fixed promise.

DEWA's published service times, counted from a complete submission, are:

These times do not include preparing drawings, answering comments or finishing site works. From our own projects, a DEWA additional load or power upgrade typically takes 2 to 4 weeks from start to certificate. See what DEWA approval involves and Dubai approvals in numbers for the full tables and sources.

Common questions

Can I apply for a DEWA approval myself?

Connection and load applications are submitted by DEWA-registered consultants and contractors appointed by the owner. Owners usually only sign the supply terms and pay the connection invoice.

Is there a fee for the DEWA application?

DEWA does not charge for the application itself, but it issues a connection cost invoice based on the load and works involved. Our own service fee is quoted separately after we review the scope.

What happens if DEWA rejects the submission?

Most rejections relate to missing documents or design comments. We correct the drawings or provide the missing items and resubmit.

Who can apply for DEWA approval?

DEWA accepts electricity permit and connection applications from enrolled consultants and contractors, not from owners directly. The owner appoints the consultant or contractor, signs DEWA's supply terms and pays the connection invoice. For projects licensed by Dubai Municipality, the request is submitted through the Dubai Building Permit System (DBPS).

Do I need a DEWA approved contractor?

Yes. Electrical work in Dubai that needs DEWA approval has to be submitted by a DEWA approved contractor or consultant, who prepares the drawings and obtains the approval. UAE Approval Hub is a DEWA approved electrical contractor in Dubai and manages the full process for you.

How long does DEWA approval take?

DEWA's published targets are short: for example 2 working days for the Building NOC, 1 to 3 working days for LV design approval depending on the load and 1 working day for the LV inspection from request. The full process usually takes longer because drawings must be prepared, comments answered and the site finished before inspection.

Guide: what DEWA approval involves

Read our step-by-step guide to DEWA approval: when you need it, the documents DEWA asks for and DEWA's published processing times.

Read the DEWA approval guide