EV charging
EV Charger Approval and Installation in Dubai
An EV charger connected to the DEWA network needs to meet DEWA's requirements, and in an apartment or managed building it also needs the building owner's agreement. The existing supply has to be able to carry the charger without overloading the board.
As a DEWA approved contractor in Dubai, we check the supply, recommend a suitable charger rating, handle the approvals and install the charger with the correct protection and cabling.
Who this is for
- Villa owners installing a home charger
- Apartment residents with an allocated parking space
- Offices and commercial buildings offering workplace charging
- Fleet operators planning depot charging
What we handle
- Site survey of the distribution board, available capacity and cable route
- Advice on charger rating and type for your vehicle and supply
- Load assessment and, where needed, an additional load request
- DEWA approval and building management NOC
- Installation, protection, testing and handover
How the process works
- SurveyWe inspect the board, the parking location and the cable route.
- RecommendationWe recommend a charger rating that suits your supply and vehicle.
- ApprovalsDEWA approval and any building management NOC are obtained.
- InstallationThe charger, cabling and protection are installed.
- Testing and handoverThe installation is tested and you are shown how to use it safely.
Documents checklist
Have these ready, or send what you have and we will tell you what is missing.
- Emirates ID and DEWA account number
- Title deed or tenancy contract
- Building management NOC for apartments and managed buildings
- Photographs of the distribution board and parking space
- Charger model, if you have already bought one
How long does it take?
A villa installation within existing capacity is usually straightforward. Apartments and commercial sites take longer because of building approvals and, sometimes, load increases.
Common questions
Can I install any charger I buy online?
The charger should meet DEWA's requirements for chargers connected to its network. Check with us before buying so the model can be approved.
Will I need more power from DEWA?
Not always. It depends on the charger rating and your existing load. The survey shows whether an additional load approval is needed.
Can chargers be installed in apartment car parks?
Often yes, with the building management's approval and a suitable supply to the parking level.
Related services
Tell us about your project
Send the details and we will reply with the approvals you need and a quotation. For a faster answer, call or WhatsApp us.
